Today was the last Saturday of September and it felt like summer outside. It was 82 degrees outside this afternoon!
I started this morning by using the steel brush to rough up the edges of the POR-15 at the bottom of the drive tunnel so the new POR-15 would adhere. Then I used the air compressor to blow off any dust from the bottoms of the floor pans.